Changsha office 0731-88922097
Zhuzhou office 0731-22867780
DETAILSPAGEProduct CenterTechnical SolutionProject Case |
Particulars
The Ningbo No. 1 subway project designed and developed by CRRC is a B-type car. The initial, near and long-term use of 6 groups, 4 movements and 2 tows, the initial number of vehicles is 22, a total of 132, the second phase was completed. Added to 39 columns for a total of 234 knots. The car body adopts all-welded drum-shaped aluminum alloy body, the maximum running speed is 80km/h, the construction speed is 90km/h, and the DC1500V overhead contact net is used for flow. The domestically produced traction system adopts the modularized and energy-saving design. Reduce the energy consumption of train operation. At present, in the CRRC, the car-based aircraft in the CRRC has successively received train orders for several subway projects, including Line 2, Line 2, Line 3, and Line 4. Key technical parameters The train formation map is as follows Our product advantages: Operating temperature range -40 to +70 °C According to the standard: IEC60571, IEC60077 (GB21413), EN50155, etc. Anti-vibration and shock resistance Meets the vibration and shock resistance requirements of EN50155, IEC61373; Cage spring clamping technology ensures that the product is reliably connected under vibration conditions. Low smoke, halogen free, flame retardant Meets EN45545 (HL1 ~ HL3) fire protection standards Wide voltage range: Control voltage range 0.7~1.25Us, integrated surge suppressor According to the standard: IEC60571, IEC60077 (GB21413), EN50155, etc. Previous: Zhengzhou Metro Line 1 Project
|